I started out by doing the final connections on the audio system and turning it on. It works and sounds fine in 2 channel. I'm going to have to wait until Ellen reconfigures the preamp to check out surround. While doing this I discovered that the subwoofer is broken again. This time I think I'll just replace it.
After that I started to cleanup and put away stuff in the garage. I got about 1/4 done before I ran out of time.
Ellen continued to cut in the kitchen. She's a little over half way done.
After lunch we went to get the truck's door lock fixed (20+ miles down to San Marcos). It cost $450 and took most of the afternoon. Then we went over to Lowes and bought some closet doors for the apartment's large bedroom and a refrigerator for the house.
When we got home I filled the garbage can up and put it out for tomorrow.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment