Wednesday, February 9, 2011

Day 112

After our typical late rising and surfing we went to Home Depot. I needed to get some materials to enclose the pipes in the well house. Ellen needed to get paint for the chest. We also used the opportunity to get the mail and lunch at Sonic.

When we got back Ellen painted while I did the enclosure. I had Home Depot do most of the plywood cutting. I cut the insulation and attached it to the plywood. There was a bit of other assembly also. I wanted to get it all done today because a cold front is coming in tonight.

While I was installing the enclosure I noticed that the thermostat on the heater isn't worth much. It's set at 45, but it was going off when the temperature was in the high 50's. Hopefully the box will help with that.

No comments:

Post a Comment