We didn't have to get up as early today, because the contractor had to pick up the tile. When he got here he put down the second layer of cement on the floor. The tile hadn't been ready in the morning, so then he went back to pick it up.
While he was gone we went out to get the mail and pick up a towel bar and a new sprayer for the guest bath. We also made a quick stop at the grocery store. We got back to the house about two minutes before the contractor did.
He had to drive all the way north to get the tile and then all the way back here. When he got here, all he could do was unload the tile and go home. That sucked.
I tried to get the helicopter I bought to work. It won't charge up. So the whole thing will have to go all the way back to Fry's. That sucked, too.
I installed the towel bar and the new sprayer. I'll try out the sprayer tonight, At least it looks cool.
We had a conference call with Jerry. He ran through the investments and we talked to him about how we want to change our goals some. I think we're on the right page. He's going to send us some info before we make the moves.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment