I was ready again this morning to do the spraying. The good news was that the wind was light to non-existent. So I went out to the garage and measured out the herbicides and put them in the sprayer. That's as far as I got. As I wheeled the sprayer out to fill it with water it started to rain. Crap.
So I put the sprayer back in the garage and went to the well house. I wanted to make sure that I wired the Loop Transfer section while I remembered what needed to be done. That was a little before 11. I was in there until almost 4. I finished all of the wiring except for the viaduct and the mainline and passing lane on the far side of the layout. All in all I wired about 26 feet of track. That brings my total to 70 feet, 85% of the track.
In order to finish the rest I have to lift up the other side of the layout. I also have to fasten down the viaduct and reposition the upper mainline piece. I bet that doesn't get done for awhile. I'm sort of burnt out on the whole thing right now.
It was good that I postponed the spraying. In the morning it was just raining really lightly. By the time I was finished with the layout it was beginning to get harder. By 6 it was raining pretty hard and long. I would have been pissed if I'd gambled that the rain was going to stop.
The layout basically took the whole day. The rest was surfing and TV.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment