We got up at 9. It was cold and the bed was warm. We did the pet stuff and had breakfast. Then I went out to work on the hull basket holder.
I attached the rail parts I'd built yesterday and then put on top rails. After that I took it out to the stand. I took Ellen along to help. I tied some cord to the rail and Ellen held it while I positioned it and put in a couple of screws. Then I took her home.
I went back out and put in the rest of the screws. I also marked some places that needed to be cut on the braces. Skip came by to shoot the station and I pulled for him. Then we bullshitted for awhile. It took me three trips back and forth to get the first brace cut right. Then I cut the second one the same way and installed them.
There were two problems. I installed the decking wrong and there was a gap between the holder decking and the station decking. I unscrewed the holder decking and reinstalled it so there was no gap. I also installed a fourth top rail because it looked better than leaving the near side open. Doing that required me to stand in the holder. It was fine.
I got done about 2. I had lunch and then did some surfing. Ellen went to a pre-board meeting. They are arguing with Dave over how much he is paying the club. Apparently things are getting heated. After surfing I went out and disassembled another 40+ 20 ga shells. I still have 80+ to go.
I went on my walk and then had dinner (TV). After dinner it was surfing and TV.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment