I woke up about 8 and played game until 9. Ellen fed the cats, I just had breakfast. After breakfast I went outside to get ready for the sewer guy.
When I was setting up the toilet sprayer I noticed that it's spray pattern was bad. I took the nozzle apart and found two small pieces of plant material and an earwig blocking parts of it. In the process of cleaning it I also discovered how to set it for more flow.
I also improved the flow to the tank sprayer by shortening the hose I bought last week and installing it. Not only is it 5/8 instead of 1/2, it doesn't kink either.
When that was done I went back inside and killed time surfing. I'm thinking about buying a 4wd buggy. Team Associated has one for $100 off.
I had lunch and was getting bored. I was just about ready to go get the B6.4 when the sewer guy showed up. I went outside and got the tank dumped. I told the guy not to block off the tube, but he still did. That spilled more shit that I had to clean up after he left. The new sprayer flows great. It really speeds up the process.
After he left I got out the B6.4. The next step was building the shocks. It was a lot of small parts combined with grease and oil. There were the usual couple of difficult assembly steps. Ellen separated the process with dinner. It was pork chops and mashed potatoes. It was good.
Between dinner and some surfing it was about 8 when I finished the shocks and installed them on the chassis. There's only one bag of parts and a few steps left.
The rest of the evening was surfing.
No comments:
Post a Comment