I woke up a little after 7, played games for a while, and then got up for pet stuff and breakfast. After that I started one of the most productive days I've had in a while.
I went to the shed and finished up the log panel. I attached the 16 logs that made up the ramp. I also made some obstacles for the reverse side of the plain ramp. That officially ends my construction of the crawler course. I also cleaned up and put everything away. It remains to be seen if I manage not to build something else.
It was a little hot and I went inside for a little surfing and lunch. About 2 the new kitchen table (actually a long narrow desk) came. I drove the car to the club to pick it up. The box was large and heavy. I needed the cart to get it out to the car. It hung out the back as I drove it back.
I unloaded the box outside and carried the pieces inside. Then I started putting it together. The construction wasn't hard, but there was a lot of parts and some were big and unwieldy. About halfway through the process the sewer guy showed up.
I spent the next hour or so on the standard sewer stuff. When I was done with that I went back inside and finished the table. By then it was after 6. Ellen was too busy with Scooter tor fix dinner, so I had a frozen one. After dinner I carried the table boxes out to the burn pile. Then I watched videos. I was too tired to remove the current table and transfer everything to the new one.
No comments:
Post a Comment