I woke up a little after 8 and played games until 9. Then it was up for pet stuff and breakfast. It was cold, about 51 degrees. I surfed for a while and then decided to work on the BBX.
The BBX is basically complete. The only things left to do are install the lights and the body panels. There are 8 lights, two head lights, 3 roof lights, two side lights, and a tail light. The tail light is red, the rest are white.
I went out to the well house and retrieved LEDs and resistors from the train stuff. Then I got out all of the tools I needed to do the work. I started by cutting out the lenses for the lights. This took a lot of time and hand fitting. When that was done I started soldering wires to the LEDs. The final step was assembling the lights with the LEDs inside.
The effort took the whole day. That's because there were 8 lights to do. It didn't help that I ended up making several trips to the well house and the garage to look for stuff like heat shrink. I still have to wire the lights to dropping resistors and install them. That won't happen for a few days because tomorrow we're going to an electric car/bicycle exhibition. We went last year and it was fun.
Abby continues to ingratiate herself. She kept bringing toys for me to play with as I worked She also tried to sit on my lap. At 33 pounds she's a little too big for that. She'll be going to the trainer in3 days and I'm already missing her. She does have a new annoying behavior. She gets shoes from the rack by the door and tries to play keep away with them.
No comments:
Post a Comment